- Seed Selection
We basically select a
seed to use, by choosing them from one of our specialist seed houses.
- Mowing
The first mowing of the
turf generally takes place 3-4 weeks after germination, and one of our rotary
mowers is used.
- Irrigation
This makes sure the turf
is moist prior to cutting and helps to ensure that it reaches the customer in
the best possible condition.
- Weed Control
Weed control takes place
throughout the entire production process and we ensure that only what we have
planted grows.
- Harvesting
Before we harvest, we
assess each field to ensure that the turf is in its best possible condition. A
pre-harvest fertiliser is also applied to our
turf.
- Distribution
The final part of our
production process is the distribution of our lawn turf. We have an extensive
distribution fleet to satisfy the requirements of each of our customers.