To produce quality turf we have to follow our production process. The main steps in the production process are as followed:
- Seed Selection
We basically select a seed to use, by choosing them from one of our specialist seed houses.
- Mowing
The first mowing of the turf generally takes place 3-4 weeks after germination, and one of our rotary mowers is used.
- Irrigation
This makes sure the turf is moist prior to cutting and helps to ensure that it reaches the customer in the best possible condition.
- Weed Control
Weed control takes place throughout the entire production process and we ensure that only what we have planted grows.
- Harvesting
Before we harvest, we assess each field to ensure that the turf is in its best possible condition. A pre-harvest fertiliser is also applied to our turf.
- Distribution
The final part of our production process is the distribution of our lawn turf. We have an extensive distribution fleet to satisfy the requirements of each of our customers.