Thursday 6 September 2012

Producing our turf


To produce quality turf we have to follow our production process. The main steps in the production process are as followed:
- Seed Selection
We basically select a seed to use, by choosing them from one of our specialist seed houses.
- Mowing
The first mowing of the turf generally takes place 3-4 weeks after germination, and one of our rotary mowers is used.
- Irrigation
This makes sure the turf is moist prior to cutting and helps to ensure that it reaches the customer in the best possible condition.
- Weed Control
Weed control takes place throughout the entire production process and we ensure that only what we have planted grows.
- Harvesting
Before we harvest, we assess each field to ensure that the turf is in its best possible condition. A pre-harvest fertiliser is also applied to our turf.
- Distribution
The final part of our production process is the distribution of our lawn turf. We have an extensive distribution fleet to satisfy the requirements of each of our customers.

No comments:

Post a Comment